ERP & Stormwater Permitting
Environmental Resource Permits (ERP) in Florida
An Environmental Resource Permit (ERP) is Florida’s permit for changing how water moves across and off a piece of land. It covers stormwater systems, and it covers work in, on, or over wetlands and other surface waters. It’s issued under Chapter 62-330 of the Florida Administrative Code, either by the Florida Department of Environmental Protection (DEP) or by one of the state’s water management districts.
Most owners first hear the words “ERP permit” from an engineer or a reviewer, partway into a project. There’s no reason you would have heard them sooner. No agency hands a first-time developer a list of every permit a site needs, and the ERP is one of about ten that can apply to a single commercial building in Southwest Florida.
Creek Engineering prepares ERP applications for owners, along with the stormwater and nutrient modeling behind them, as part of our civil engineering services across Charlotte, Sarasota, Lee, Collier, DeSoto, Manatee, Hendry, Hillsborough, Glades, Hardee, and Highlands counties. This page covers what the permit is, whether your project needs one, who issues it where you’re building, and what getting one involves now that the state’s stormwater rules have changed.
What an ERP Permit Covers, and What It Doesn't
Erik Colleen, Creek’s Vice President (Client Guide), explains the permit this way: when you take ground that water naturally soaks into and cover it with something hard, you create two problems. You lose the resource, and you have to answer for where the water goes now. He’d call it a water resource permit, because that’s what it’s really about.
In practice, the ERP has two halves:
- Stormwater. How much water leaves your site, how fast, and how clean. Every drop that falls on the property has to be collected (catch basins), conveyed (sized pipe), held in a pond or another storage system, and released through a controlled outfall at a rate the model has proven out.
- Wetlands and surface waters. Any work in, on, or over a wetland, creek, ditch, or other surface water, including filling, crossing, or dredging.
It’s just as important to know what the ERP isn’t:
- It isn’t the county’s stormwater review. Counties review drainage on their own, through site plan or development review. Erik’s first question on any change to a site is “are we talking state or county?” Usually the answer is both.
- It isn’t federal authorization. Work in wetlands or waterways can also need the U.S. Army Corps of Engineers, and an ERP doesn’t stand in for it.
- It isn’t approval for the site itself. On a one-acre commercial building, the state ERP is one permit in a sequence that also includes zoning, the county site plan, utilities, and the building permit. Our commercial site work page walks through how they fit together.
Here’s a case that shows why both levels matter. At a car dealership, a new pressure-wash building was going onto pavement that was already there, swapping one hard surface for another. The county’s stormwater engineer still wanted a signed and sealed model, because the building changes how water moves across that asphalt. That’s not an unreasonable position. A reviewer can’t approve a change on the owner’s word that it’s minor; they need a document, sealed by an engineer, that shows what will happen and that they can hold the project to later.
Under the new rules, a stormwater pond isn’t sized from a recipe anymore. It’s sized from a calculation, and that calculation decides how much of your land you can build on.
Testimonials From Our Clients
Does My Project Need an ERP Permit?
Rule 62-330.020(2) lists what requires an ERP. A project needs one if, alone or together with other work, it involves any of these:
- Any work in, on, or over wetlands or other surface waters.
- More than 4,000 square feet of impervious or semi-impervious surface subject to vehicular traffic. Driveways, parking, drive aisles, and roads all count.
- More than 9,000 square feet of impervious or semi-impervious surface in total. Roofs, pavement, and concrete pads together.
- A total project area of more than five acres.
- Any project that’s part of a larger common plan of development or sale.
- Any modification or alteration of a project previously permitted under the state’s ERP program.
The rule also covers dams, large impoundments, boat storage, and district-specific thresholds in each water management district’s Applicant’s Handbook Volume II. Those come up less often on the projects we see, and we check them on every site.
The 4,000 square feet that surprises people
The vehicular threshold is the one that catches people, because 4,000 square feet isn’t much pavement. A homeowner in DeSoto County building a long access road across a wetland and over a creek ended up with roughly 7,000 square feet of road. That put him well over the threshold and brought in a full stormwater design: treatment swales on both sides of the road and both sides of the creek, and a wider road corridor than he’d planned for. He’d done a lot right on his own. The threshold just isn’t something anyone would think to look up.
Changing a site that already has a permit
Item 6 is the one that matters most to owners of existing commercial property. If the site was built under an ERP, changing it is itself an ERP question, and usually a county question too. Our site plan modifications page covers what counts as a change and how the minor and major paths differ. If you’re asking whether a change needs a permit at all, start there.
Exemptions, general permits, and individual permits: the four paths
Not every project that touches the thresholds needs the same kind of permit. Which path fits depends on size, location, and what the site touches.
| Path | Rule | Who it usually fits | What you file |
|---|---|---|---|
| Exempt | Rule 62-330.051 | A single-family home, duplex, triplex, or quadruplex with no work in wetlands or surface waters, not part of a larger common plan that needs a permit | No ERP, but other permits still apply |
| 10/2 self-certification | s. 403.814(12), F.S. | Projects under 10 acres total with under 2 acres of impervious surface | An electronic self-certification by a Florida-registered professional before construction |
| Noticed general permit | Rule 62-330.402 and the activity-specific general permits | Specific activity types the state has pre-approved, such as certain utility lines, docks, and redevelopment | A notice at least 30 days before work; the agency has 30 days to decide whether it qualifies |
| Individual permit or conceptual approval | Chapter 62-330; conceptual approval under Rule 62-330.056 | Everything that doesn’t fit the paths above, and phased or master-planned projects | A full application with plans, calculations, and a surface water management report |
A few things worth knowing about each:
- Exempt doesn’t mean no paperwork. The exemption rule says exempt work on state-owned submerged lands still needs separate authorization, and the county’s own drainage review still applies.
- The 10/2 is built for the small commercial site. A stormwater system on a project under 10 acres with under 2 acres of impervious surface can be built after an electronic self-certification, without further agency action, if it’s designed by a Florida-registered professional, involves no wetland or surface water impacts, uses pipes no larger than 24 inches, uses no pumps, and isn’t part of a larger common plan. The design still has to meet the state’s stormwater rules. The self-certification puts that on the design professional instead of an agency review.
- A conceptual approval doesn’t authorize construction. It approves the design concept for a master plan. It’s good for 20 years if the first phase is permitted and work starts within five years; otherwise it expires at five.
How long the agencies have to review an individual application changed recently too. Our article on Florida’s new permit deadlines covers the review clocks.
Who Issues It in Southwest Florida: SWFWMD, SFWMD, or DEP
DEP and the five water management districts split ERP work through operating agreements. DEP generally reviews single-family homes that aren’t part of a larger plan, docks that aren’t part of a larger development, work seaward of the coastal construction control line, mining, power and utility lines, waste facilities, and seaports. The water management districts review all other ERP applications, which covers nearly all commercial site work.
Which district depends on your county:
| County | Water management district |
|---|---|
| Sarasota, Manatee, DeSoto, Hillsborough, Hardee | Southwest Florida Water Management District (SWFWMD) |
| Lee, Collier, Hendry, Glades | South Florida Water Management District (SFWMD) |
| Charlotte, Highlands | Split between the two districts |
On a Charlotte or Highlands County project, the first question is which district the property sits in. We check that before anything else is designed, because the two districts each publish their own Applicant’s Handbook Volume II with their own design details.
SWFWMD ERP
The Southwest Florida Water Management District reviews ERP applications for most commercial and multi-lot projects in Sarasota, Manatee, DeSoto, Hillsborough, and Hardee counties and the SWFWMD side of Charlotte and Highlands. Applications go through the district’s online permitting system.
SFWMD ERP
The South Florida Water Management District reviews ERP applications in Lee, Collier, Hendry, and Glades counties and the SFWMD side of Charlotte and Highlands. It’s the largest district in the state, reaching from the Keys to the Orlando area.
If you want to see how many other offices a civil project runs through, our Southwest Florida building departments guide lays them out county by county.
Where the Stormwater and Nutrient Standards Live
The biggest change to Florida stormwater design in decades happened inside the ERP program, and it’s the main reason this work has become so specialized.
Here’s how it came together:
- 2020: The Clean Waterways Act (SB 712) directed DEP to update the state’s stormwater design and operation rules.
- June 28, 2024: SB 7040 ratified the new rule with amendments, the governor signed it, and the rule revisions took effect. The operation and maintenance requirements started applying to new applications that day.
- December 28, 2025: The new performance criteria in Section 8.3 of the ERP Applicant’s Handbook Volume I started applying to applications completed after this date. They cover general and individual permits and major modifications of existing permits.
The change in one sentence: modeling or calculations are now required rather than presumptive design. For decades, if you built a pond to the published recipe, the state presumed it treated the water well enough. Now the engineer has to show, with numbers, how much nitrogen and phosphorus the site sends downstream before and after development, and that the design removes enough of it. DEP keeps its own summary of the dates and requirements at its ERP Stormwater Resource Center.
The minimum reductions in Section 8.3:
| Where your water goes | Total phosphorus | Total nitrogen | Also required |
|---|---|---|---|
| Most sites | 80% | 55% | Or post-development load no higher than pre-development, whichever is more protective |
| An Outstanding Florida Water | 90% | 80% | Or post no higher than pre |
| An impaired water | 80% | 80% | And post no higher than pre, plus a net improvement |
| Both impaired and an Outstanding Florida Water | 95% | 95% | And post no higher than pre, plus a net improvement |
| Redevelopment, under limited conditions | 80% | 45% | Higher targets where the water is an Outstanding Florida Water or impaired |
Which row applies depends on where your stormwater ends up, and that’s one of the first things we check. It’s worth understanding why the state asks for this. Nitrogen and phosphorus running off developed land feed the algae blooms that close beaches and kill fish along this coast, and the estuaries from Sarasota Bay to Charlotte Harbor take the brunt of it. Holding every new site to a measured standard is a reasonable way to stop adding to the problem.
What’s grandfathered. Existing permits aren’t affected unless they go through a major modification. Minor modifications, conceptual approvals issued before the rule took effect, and applications complete before the deadline keep the old criteria. So do stormwater plans a local government approved before January 1, 2024, in listed circumstances such as a building permit, site plan, or subdivision plat approval. For more on the standard itself, our article on Florida’s new nutrient modeling requirements goes deeper.
What the modeling actually involves
Stormwater modeling and nutrient modeling are two separate jobs that end up in one report.
The stormwater model runs the site through a battery of design storms, using rainfall data for the area, and shows that the pond, pipes, and outfall structure hold and release the water at the rates the district allows. We run that modeling in-house in AdICPR, the hydrologic and hydraulic modeling software used widely in Florida.
The nutrient model calculates the site’s pollutant load before development and after, from land use, hydrology, and event mean concentrations (the typical nitrogen and phosphorus content of runoff from each kind of land use). Then it shows how the treatment design meets the required reduction. That design can be a wet pond, a dry pond, swales, filters, underground systems, or a treatment train that combines several.
Both models are only as good as what goes into them. Two inputs come from the ground itself:
- The survey, from a licensed surveyor. Creek doesn’t run a survey crew; we work from yours or help you commission one.
- Soil and groundwater data. How fast water soaks into the soil and how high the water table sits decide how big a pond has to be. Our geotechnical engineering team does the borings and permeability testing on site, rather than borrowing numbers from a nearby report. In Florida’s layered soils, water moves sideways much faster than it moves straight down, and a design that ignores that can be off in either direction.
The deliverable is a surface water management report. On a commercial site it can run to a couple of hundred pages, because every piece of the system has to be justified: why the pond is that size, and why each culvert, catch basin, skimmer, and weir is what it is. It’s long because the reviewer has to be able to check every number.
After the permit. The 2024 rule also changed what happens once the system is built. Every application now includes an operation and maintenance plan and an estimate of the system’s maintenance costs. Since June 28, 2025, inspections have to be done by a qualified inspector. That lands on the owner, the HOA, or the property manager for the life of the site, so it’s worth knowing about before you buy.
Locations We Serve
We’re based in the city of Port Charlotte and serve the entire area of Southwest Florida, especially the following counties:
- Charlotte County – Port Charlotte, Punta Gorda, Deep Creek, Rotonda West, Cleveland, Burnt Store, Charlotte Harbor, etc.
- Collier County – Naples, Everglades City, Naples Manor, Goodland, etc.
- DeSoto County – Arcadia, Ft. Ogden, Nocatee, etc.
- Glades County – Moore Haven, Buckhead Ridge, Palmdale, Lakeport, Ortona, etc.
- Hardee County – Wauchula, Bowling Green, Zolfo Springs, Ona, Limestone, etc.
- Hendry County – LaBelle, Harlem, Clewiston, Montura, etc.
- Highlands County – Sebring, Avon Park, Lake Placid, Lorida, Venus, etc.
- Hillsborough County – Tampa, Ruskin, Plant City, etc.
- Lee County – Bonita Springs, Fort Myers, Cape Coral, Estero, etc.
- Manatee County – Bradenton, Lakewood Ranch, Bayshore Gardens, Palmetto, etc.
- Sarasota County – North Port, Venice, Sarasota, Englewood, Nokomis, etc.
What It Does to Your Site Plan and Budget
Here’s the part that isn’t published anywhere: the new standard changes how much of your land you can build on.
We lay out a site in a set order. The building footprint and pavement concept come first, then access, then utilities. Stormwater and nutrient modeling come once the layout holds, because they size the pond around what’s actually being built. Landscaping comes last.
When the numbers say the pond has to get bigger, there are only a few ways to go. A larger open pond takes land. A chambered system under the parking lot with inline filters saves land, but it’s a lot more expensive. One of our clients was looking at a stormwater pond that would have cost more than three times the lot next door, which happened to be for sale. They bought the lot and graded a pond on it instead.
That’s why, when a buyer asks whether a commercial site needs more land than they planned, Erik’s answer is “always, always, yes, you need more land.” In our experience, a half-acre commercial lot that worked a few years ago often doesn’t anymore, and something closer to two acres is a more realistic target under the new stormwater and nutrient rules. Frontage on a state road or a creek crossing can raise the bar again; our watershed analysis page covers those cases.
None of this is high stakes if you find it out early, because there’s always a solution. Anything can be solved with money; the question is whether it’s efficient. The cheapest time to ask is before you close on the land. If you’re still evaluating a property, a lot feasibility study is where we’d start. If a project is going to fail, we’d rather find the fastest path to that answer than let you spend months designing around it.
Why this work is specialized
Under the old presumptive rules, a lot of stormwater design followed a recipe. Under the new ones, every site is a calculation, and the calculation depends on the soils, the water table, the receiving water, and the district’s own handbook. It takes modeling software, field data, and someone who has taken applications through the districts and answered their questions.
We expect this to become a bigger part of land development in Southwest Florida than most people have planned for, because nearly every commercial site plan meets it and the work behind it is specialized. That’s why it sits inside our civil practice, next to the site design it shapes.
What to expect working with Creek
- First conversation. Send us what you have: a parcel ID, a survey, a concept sketch, or a reviewer’s comments. We’ll tell you which permits are likely in play, state and county.
- Pre-application. We meet with the agencies that have a say on the site (the county, the water management district, and FDOT where there’s state road frontage) before design, and you’re welcome in those meetings. The goal is an approvable concept and no surprises.
- Field data. Survey, soil borings, and permeability testing.
- Design and modeling. The site plan, the stormwater model, and the nutrient calculations, wrapped into the surface water management report.
- Application and review. We assemble the application and answer the agency’s requests for additional information.
- Permit, construction, and after. The operation and maintenance plan travels with the site.
On a commercial site, the path from the start of pre-application to permits in hand often runs many months, which is one more reason to start the conversation before the land is under contract.
Why Creek
We’ve been serving Southwest Florida since 2002. Civil, geotechnical, environmental, and septic engineering sit under one roof here, so the soil testing, the wetland questions, and the stormwater design come from the same team, and you work with the same people from the first call through the final permit.
Partners & Organizations
Let's Talk About Your ERP Permit
Send us what you have. A survey, a concept plan, or a parcel ID is enough to start. Use the form below, contact Creek Engineering, or call (941) 624-6425.
ERP & Stormwater Permitting
Frequently Asked Questions
An Environmental Resource Permit (ERP) is Florida’s permit for stormwater systems and for work in, on, or over wetlands and other surface waters. It’s issued under Chapter 62-330, F.A.C., by DEP or one of the state’s water management districts, and it’s where the state’s stormwater and nutrient treatment standards are applied.
Under Rule 62-330.020, a project needs an ERP if it has more than 4,000 square feet of impervious or semi-impervious surface subject to vehicles, more than 9,000 square feet of impervious or semi-impervious surface in total, or more than five acres of total project area. Any work in wetlands or surface waters, any project that’s part of a larger common plan, and any change to a previously permitted project also trigger one.
Usually not. A single-family home, duplex, triplex, or quadruplex is exempt if it involves no work in wetlands or other surface waters and isn’t part of a larger common plan of development that needs a permit. A long driveway or road across a wetland or creek can change that.
Sarasota, Manatee, DeSoto, Hillsborough, and Hardee counties are in the Southwest Florida Water Management District. Lee, Collier, Hendry, and Glades counties are in the South Florida Water Management District. Charlotte and Highlands counties are split between the two, so it depends on where the property sits.
It’s a general permit in s. 403.814(12), F.S., for stormwater systems on projects under 10 acres total with under 2 acres of impervious surface. If a Florida-registered professional designs the system and files an electronic self-certification, it can be built without further agency action, as long as there’s no work in wetlands or surface waters, no pipe larger than 24 inches, no pumps, and the project isn’t part of a larger common plan.
Applications completed after December 28, 2025 must meet the new performance criteria in Section 8.3 of the ERP Applicant’s Handbook Volume I. Modeling or calculations are now required instead of presumptive design, and most sites must show at least an 80% reduction in phosphorus and 55% in nitrogen, with higher targets for sites draining to Outstanding Florida Waters or impaired waters.
No. Counties review drainage separately through site plan or development review, and work in wetlands or waterways can also need federal authorization from the U.S. Army Corps of Engineers. Most commercial projects need the state ERP and the county approval.
Any modification of a project previously permitted under the state’s ERP program is itself an ERP trigger. Minor modifications keep the criteria the site was permitted under; a major modification brings in the current rules, including the new nutrient standard.
