ERP & Stormwater Permitting

An Environmental Resource Permit (ERP permit) is Florida's permit for changing how water moves across and off your land. Creek prepares ERP permit applications and the stormwater and nutrient modeling behind them across 11 Southwest Florida counties.

2002
The year Creek started serving Southwest Florida
11
Counties, from Hillsborough to Collier
4
Disciplines under one roof: civil, geotechnical, environmental, septic
  • National Association of Home Builders member
  • Florida Home Builders Association member
  • Suncoast Builders Association member
  • Cape Coral Construction Industry Association member
  • Charlotte County Chamber of Commerce member
  • North Port Area Chamber of Commerce member

Does my project need an ERP permit?

Rule 62-330.020(2) lists the triggers. Check anything that's true of your project, alone or together with other work.

My project involves…
Nothing checked yet. Small projects can be exempt, but the county's own drainage review still applies.

The vehicle threshold is the one that catches people. A DeSoto County homeowner's access road across a wetland came to roughly 7,000 square feet, which brought in treatment swales on both sides of the road and both sides of the creek. Rule thresholds for dams, impoundments, and boat storage also apply; we check them on every site.

Changing a site that already has a permit is its own ERP question, and usually a county one too. Our site plan modifications page covers the minor and major paths, and this article covers whether a change needs a permit at all.

What an ERP permit covers, and what it doesn't

When you cover ground that water naturally soaks into, you lose the resource and you have to answer for where the water goes now. Erik Colleen, Creek's Vice President (Client Guide), would call it a water resource permit.

How a permitted stormwater system works
Cross-section: rain on pavement runs to a catch basin, through a pipe to a pond, and out through a control structure to a creek 1 2 3 4
  1. CollectCatch basins take every drop that falls on the property.
  2. ConveyPipe sized to carry the design storm.
  3. Store and treatA pond or other storage holds the water and removes nitrogen and phosphorus.
  4. ReleaseA control structure lets it out at the rate the model has proven out.
ItemERP?Detail
StormwaterCoveredCollected in catch basins, carried in sized pipe, held in a pond, released through a controlled outfall at the modeled rate.
Wetlands and surface watersCoveredFilling, crossing, or dredging in, on, or over a wetland, creek, or ditch.
County stormwater reviewSeparateCounties review drainage on their own, through site plan review. "Are we talking state or county?" Usually both.
Army Corps of EngineersSeparateWork in wetlands or waterways can also need federal authorization.
Site approvalSeparateZoning, the county site plan, utilities, and the building permit. See commercial site work.

Four permit paths

Not every project that crosses a threshold needs a full environmental resource permit. Which path fits depends on size, location, and what the site touches.

Rule
62-330.051
Usually fits
A single-family home, duplex, triplex, or quadruplex with no wetland work, not part of a larger plan
You file
No ERP, but other permits still apply
Exempt doesn't mean no paperwork. Work on state-owned submerged lands still needs separate authorization, and the county's drainage review still applies.

Who issues the ERP permit in Southwest Florida

The water management districts review nearly all commercial site work. DEP takes single-family homes, standalone docks, coastal work, mining, utilities, and seaports.

CountyDistrict
Sarasota, Manatee, DeSoto, Hillsborough, HardeeSWFWMD
Lee, Collier, Hendry, GladesSFWMD
Charlotte, HighlandsSplit  We check which side the parcel sits on first.

Each district publishes its own Applicant's Handbook Volume II with its own design details. For every other office a civil project runs through, see the Southwest Florida building departments guide.

The new stormwater and nutrient standards

  1. 2020 · The Clean Waterways Act directs DEP to update the stormwater rules.
  2. June 28, 2024 · SB 7040 ratifies the rule; operation and maintenance requirements begin.
  3. Dec 28, 2025 · Section 8.3 performance criteria apply to applications completed after this date.

Modeling or calculations are now required instead of presumptive design. The engineer has to show, with numbers, how much nitrogen and phosphorus the site sends downstream before and after development, and that the design removes enough of it. DEP keeps its own summary of the dates and requirements at its ERP Stormwater Resource Center.

Where your water goesPhosphorusNitrogenAlso required
Most sites80%55%Or post no higher than pre
Outstanding Florida Water90%80%Or post no higher than pre
Impaired water80%80%Plus a net improvement
Impaired and Outstanding95%95%Plus a net improvement
Redevelopment, limited80%45%Higher for Outstanding or impaired
What's grandfathered

Existing permits aren't affected unless they go through a major modification. Minor modifications, earlier conceptual approvals, applications complete before the deadline, and local stormwater plans approved before January 1, 2024 in listed circumstances keep the old criteria. More in our article on Florida's new nutrient modeling requirements.

What the modeling actually involves

Two jobs, one report. The stormwater model (run in-house in AdICPR) puts the site through a battery of design storms. The nutrient model calculates pollutant load before and after development. Both depend on the survey and on soil and groundwater data, which our geotechnical engineering team gathers on site. The surface water management report can run to a couple of hundred pages on a commercial site.

After the permit

Every application includes an operation and maintenance plan and cost estimate. Since June 28, 2025, inspections need a qualified inspector, for the life of the site. Worth knowing before you buy.

What clients say about working with Creek

★★★★★

No needless delays

"Most experienced, most organized and the best equipment by far. And the best of all is they are able to perform quickly without needless delays."

Michael WeaverGoogle, June 2026
★★★★★

Ready for inspection on short notice

"They were able to come out to my site on short notice and completed the compaction test promptly, ensuring everything was ready for my scheduled inspection."

Giovanni CruzGoogle, February 2026
★★★★★

They went the extra mile

"They have shared their expertises, informations and workmanships with me… They helped me and they went extra mile for me to get the job done."

Bruce NguyenGoogle, January 2026

What it does to your site plan and budget

Always, always, yes, you need more land.Erik ColleenErik Colleen, Vice President (Client Guide)
½ ac → ~2 ac

A half-acre commercial lot that worked a few years ago often doesn't anymore.

We lay out a site in a set order: footprint and pavement, access, utilities, then stormwater and nutrient modeling, then landscaping. When the pond has to grow, a larger open pond takes land, and a chambered system under the parking lot saves land but costs a lot more. One client's pond would have cost more than three times the lot next door, so they bought the lot and graded a pond on it.

Frontage on a state road or a creek crossing can raise the bar again; our watershed analysis page covers those cases. None of this is high stakes if you find it out early. The cheapest time to ask is before you close; a lot feasibility study is where we'd start.

What to expect working with Creek

  1. First conversationSend a parcel ID, survey, concept sketch, or reviewer's comments. We'll tell you which permits are likely in play, state and county.
  2. Pre-applicationWe meet the county, the water management district, and FDOT where there's state road frontage, before design. You're welcome in those meetings.
  3. Field dataSurvey, soil borings, and permeability testing.
  4. Design and modelingSite plan, stormwater model, and nutrient calculations, wrapped into the surface water management report.
  5. Application and reviewWe assemble the application and answer the agency's requests for additional information.
  6. Permit, construction, and afterThe operation and maintenance plan travels with the site.

Civil, geotechnical, environmental, and septic engineering under one roof, serving Southwest Florida since 2002.

Locations we serve

We're based in Port Charlotte and serve all of Southwest Florida, especially these counties:

  • Charlotte County: Port Charlotte, Punta Gorda, Deep Creek, Rotonda West, Cleveland, Burnt Store, Charlotte Harbor
  • Collier County: Naples, Everglades City, Naples Manor, Goodland
  • DeSoto County: Arcadia, Fort Ogden, Nocatee
  • Glades County: Moore Haven, Buckhead Ridge, Palmdale, Lakeport, Ortona
  • Hardee County: Wauchula, Bowling Green, Zolfo Springs, Ona, Limestone
  • Hendry County: LaBelle, Harlem, Clewiston, Montura
  • Highlands County: Sebring, Avon Park, Lake Placid, Lorida, Venus
  • Hillsborough County: Tampa, Ruskin, Plant City
  • Lee County: Bonita Springs, Fort Myers, Cape Coral, Estero
  • Manatee County: Bradenton, Lakewood Ranch, Bayshore Gardens, Palmetto
  • Sarasota County: North Port, Venice, Sarasota, Englewood, Nokomis

Let's Talk About Your ERP Permit

Send us what you have. A survey, a concept plan, or a parcel ID is enough to start. Use the form below, contact Creek Engineering, or call (941) 624-6425.

Calle / Ciudad / Estado / Código postal

ERP & Stormwater Permitting

Preguntas frecuentes

An Environmental Resource Permit (ERP) is Florida’s permit for stormwater systems and for work in, on, or over wetlands and other surface waters. It’s issued under Chapter 62-330, F.A.C., by DEP or one of the state’s water management districts, and it’s where the state’s stormwater and nutrient treatment standards are applied.

Under Rule 62-330.020, a project needs an ERP if it has more than 4,000 square feet of impervious or semi-impervious surface subject to vehicles, more than 9,000 square feet of impervious or semi-impervious surface in total, or more than five acres of total project area. Any work in wetlands or surface waters, any project that’s part of a larger common plan, and any change to a previously permitted project also trigger one.

Usually not. A single-family home, duplex, triplex, or quadruplex is exempt if it involves no work in wetlands or other surface waters and isn’t part of a larger common plan of development that needs a permit. A long driveway or road across a wetland or creek can change that.

Sarasota, Manatee, DeSoto, Hillsborough, and Hardee counties are in the Southwest Florida Water Management District. Lee, Collier, Hendry, and Glades counties are in the South Florida Water Management District. Charlotte and Highlands counties are split between the two, so it depends on where the property sits.

It’s a general permit in s. 403.814(12), F.S., for stormwater systems on projects under 10 acres total with under 2 acres of impervious surface. If a Florida-registered professional designs the system and files an electronic self-certification, it can be built without further agency action, as long as there’s no work in wetlands or surface waters, no pipe larger than 24 inches, no pumps, and the project isn’t part of a larger common plan.

Applications completed after December 28, 2025 must meet the new performance criteria in Section 8.3 of the ERP Applicant’s Handbook Volume I. Modeling or calculations are now required instead of presumptive design, and most sites must show at least an 80% reduction in phosphorus and 55% in nitrogen, with higher targets for sites draining to Outstanding Florida Waters or impaired waters.

No. Counties review drainage separately through site plan or development review, and work in wetlands or waterways can also need federal authorization from the U.S. Army Corps of Engineers. Most commercial projects need the state ERP and the county approval.

Any modification of a project previously permitted under the state’s ERP program is itself an ERP trigger. Minor modifications keep the criteria the site was permitted under; a major modification brings in the current rules, including the new nutrient standard.